
商城助理
- 微信:
-
qq:
- 电话: 13760129277
- 时间: 周一至周五,09:00-18:00
商城助理
产品名称: 共模扼流圈/滤波器 WE-CMBH Choke Hztl 2x2.2mH 10kHz 6A | ||
品牌:Wurth Elektronik | 封装 : | 封装: |
最少包装: 1 | 库存渠道: | 最少订单量: 1 |
744834622 产品描述:自营 | ||
共模扼流圈/滤波器 WE-CMBH Choke Hztl 2x2.2mH 10kHz 6A |
Why do I need a 6 Star energy rating?
In most Australian states the government requires that all new homes and apartments (along with certain types of building extensions) built since 2010 be energy rated and achieve a minimum of 6 Stars.
What information do I need to supply for an energy rating to be completed?
The information required to complete a full and comprehensive energy report are the following final working drawings: Site Plan, Floor Plan, Elevations, Sections, Lighting layout and window schedule (including sizes of the existing windows).
Does building an extension need an energy rating?
Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.
What is the general cost of an energy rating?
Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.