欢迎您来到IC商城,专业的IC电子元器件采购网上商城
温馨提示:图片仅供参考,商品以实物为准

STM1061N22WX6F

STM1061N22WX6F
集成电路(IC) STM1061N22WX6F
阶梯价: 共计: 0
产品二维码 产品二维码
阶梯价:
  • 1+
数量:
库存量: 8370 PCS
  • 微信:
    微信咨询

    微信扫码咨询

  • qq: 点击这里给我发消息
  • 电话: 13760129277
  • 时间: 周一至周五09:00-18:00
型号推荐

    感兴趣的商品

  • MAX328CPE+

    制造商: Analog Devices Inc./Maxim Integrated

    封装: 16-DIP

    $215.260

  • HCPL-7510-000E

    制造商: Broadcom Limited

    封装: 8-DIP

    $26.918

  • L6506D

    制造商: STMicroelectronics

    封装: 20-SOIC

    $24.042

    热门型号

  • MAX328CPE+

    制造商: Analog Devices Inc./Maxim Integrated

    封装: 16-DIP

    $215.260

  • HCPL-7510-000E

    制造商: Broadcom Limited

    封装: 8-DIP

    $26.918

  • L6506D

    制造商: STMicroelectronics

    封装: 20-SOIC

    $24.042

  • HCPL-7800A-000E

    制造商: Broadcom Limited

    封装: 8-DIP

    $64.354

  • DS80C323-ECD+

    制造商: Analog Devices Inc./Maxim Integrated

    封装: 44-TQFP

    $57.243

产品名称: STM1061N22WX6F
品牌:STMicroelectronics 封装 :卷带(TR) 封装: TO-236-3
最少包装: 1 库存渠道: 最少订单量: 3000
STM1061N22WX6F 产品描述:自营
IC SUPERVISOR 1 CHANNEL SOT23-3
产品属性
其他信息
暂无
数据手册
STM1061N22WX6F 数据手册

FAQs

  • Why do I need a 6 Star energy rating?

    In most Australian states the government requires that all new homes and apartments (along with certain types of building extensions) built since 2010 be energy rated and achieve a minimum of 6 Stars.

  • What information do I need to supply for an energy rating to be completed?

    The information required to complete a full and comprehensive energy report are the following final working drawings: Site Plan, Floor Plan, Elevations, Sections, Lighting layout and window schedule (including sizes of the existing windows).

  • Does building an extension need an energy rating?

    Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.

  • What is the general cost of an energy rating?

    Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.