Welcome来到IC商城,专业的IC电子元器件采购网上商城
Warm prompt:The pictures are for reference only, and the actual product shall prevail

MAX4619CPE+

MAX4619CPE+
集成电路(IC) MAX4619CPE+
tieredpricing: total: 0
产品二维码 产品二维码
tieredpricing:
  • 1+
quantity:
inventory: 36 PCS
  • wechat:
    微信咨询

    WeChat Scanning Consultation

  • qq: 点击这里给我发消息
  • phone: 13760129277
  • time: Monday to Friday09:00-18:00
Model Recommendation

    Products of Interest

  • HCPL-7800A-000E

    manufacturer: Broadcom Limited

    package: 8-DIP

    $64.354

  • L6506D

    manufacturer: STMicroelectronics

    package: 20-SOIC

    $24.042

  • HCPL-7510-000E

    manufacturer: Broadcom Limited

    package: 8-DIP

    $26.918

    popular models

  • HCPL-7800A-000E

    manufacturer: Broadcom Limited

    package: 8-DIP

    $64.354

  • L6506D

    manufacturer: STMicroelectronics

    package: 20-SOIC

    $24.042

  • HCPL-7510-000E

    manufacturer: Broadcom Limited

    package: 8-DIP

    $26.918

  • MAX328CPE+

    manufacturer: Analog Devices Inc./Maxim Integrated

    package: 16-DIP

    $215.260

  • L78L12ACZ-TR

    manufacturer: STMicroelectronics

    package: TO-226-3

    $1.019

product name: MAX4619CPE+
brand:Analog Devices Inc./Maxim Integrated package :管件 package: 16-DIP
mpq: 1 inventory channels: moq: 1
MAX4619CPE+ product desc:own
IC SWITCH SPDT X 3 10OHM 16DIP
product attributes
other message
none
data pdf
MAX4619CPE+ data pdf

FAQs

  • Why do I need a 6 Star energy rating?

    In most Australian states the government requires that all new homes and apartments (along with certain types of building extensions) built since 2010 be energy rated and achieve a minimum of 6 Stars.

  • What information do I need to supply for an energy rating to be completed?

    The information required to complete a full and comprehensive energy report are the following final working drawings: Site Plan, Floor Plan, Elevations, Sections, Lighting layout and window schedule (including sizes of the existing windows).

  • Does building an extension need an energy rating?

    Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.

  • What is the general cost of an energy rating?

    Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.