
Mall Assistant
- wechat:
-
qq:
- phone: 13760129277
- time: Monday to Friday,09:00-18:00
Mall Assistant
product name: OCXO振荡器 GPSDO 10MHZ 60x60 +/-0.2ppb -40C - 85C 5V 8.0us over 24hrs | ||
brand:ABRACON | package : | package: |
mpq: 1 | inventory channels: | moq: 1 |
ABCM-60-10.000MHZ-BC-LN product desc:own | ||
OCXO振荡器 GPSDO 10MHZ 60x60 +/-0.2ppb -40C - 85C 5V 8.0us over 24hrs |
product attributes |
---|
other message | |
---|---|
none |
data pdf | |
---|---|
Why do I need a 6 Star energy rating?
In most Australian states the government requires that all new homes and apartments (along with certain types of building extensions) built since 2010 be energy rated and achieve a minimum of 6 Stars.
What information do I need to supply for an energy rating to be completed?
The information required to complete a full and comprehensive energy report are the following final working drawings: Site Plan, Floor Plan, Elevations, Sections, Lighting layout and window schedule (including sizes of the existing windows).
Does building an extension need an energy rating?
Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.
What is the general cost of an energy rating?
Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.